30 as part of the $6.88 million Rhodes Point project. Ed Chamberlayne, Baltimore District commander.Ĭoastal Design & Construction Inc., a small business out of Gloucester, Virginia, began sill excavation Nov. These projects will not only improve transportation for the residents of Smith Island but will also protect them against sea-level rise and coastal erosion, while also helping to improve the environment,” said Col. “I’m very proud of our collective team from the federal, state and local governments that helped get these critical projects funded and the contracts awarded. The project, in coordination with Maryland Department of Natural Resources and Somerset County, consists of the realignment of a portion of the federal navigation channel in Sheep Pen Gut through dredging construction of two jetties to prevent shoaling in the channel and to reduce the continual need for dredging and creation of a stone sill along the shoreline to prevent further erosion and contain the clean dredged material from the project. ![]() ![]() Army Corps of Engineers, Baltimore District, is starting work on two critical projects to benefit Smith Island residents - a navigation improvement project at Rhodes Point that includes the construction of two jetties, and dredging the Big Thorofare and Twitch Cove federal channels. Federal, State and Local Partners Move on Critical Navigation and Environmental Projects
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |